Issues Open for Public Comment: Updated SIP Documentation
SIP Subsections IX. H11, 12, and 13
- Part H BYU Units 4 and 6
NOx limits for Units #4 and #6 were inadvertently omitted and replaced
with stack testing frequencies. These are the corrected conditions (B. and C.) that
appear in Subsection IX.H. 13 a.ii.
- Part H KUC UPP Missing Page
Condition iii. pertaining to Unit 4 at the Utah Power Plant was truncated.
The omitted portion begins at iii.B, and would appear following condition iii. A of
Subsection IX.H.12 l.
PM2.5 Technical Support Documentation
- TSD KUC BCM Concentrator
Cover pages for the RACT analysis for Kennecott's Bingham Canyon Mine
and Copperton Concentrator were omitted. These pages should appear prior to page 1
of TSD Section 5.c.xvii.
- TSD KUC Power Plant
Cover pages for the RACT analysis for Kennecott's Power Plant and Tailings
Impoundment were omitted. These pages should appear prior to page 1 of TSD Section
5.c.xviii.
- TSD KUC Refinery Smelter
Cover pages for the RACT analysis for Kennecott's Refinery and Smelter and
Molybdenum Autoclave Process were omitted. These pages should appear prior to
page 1 of TSD Section 5.c.xvix.
- TSD Murray City
Cover pages for the RACT analysis for Murray City Power Department
Electrical Generation Plant were omitted. These pages should appear prior to page 1 of
TSD Section 5.c.xx.
- TSD P and G
Cover pages for the RACT analysis for Proctor and Gamble Paper
Manufacturing Plant were omitted. These pages should appear prior to page 1 of TSD
Section 5.c.xxix.
- TSD Tesoro
Cover pages for the RACT analysis for Tesoro Refining and Marketing were
omitted. These pages should appear prior to page 1 of TSD Section 5.c.xxxiii.
- TSD Utility Trailer
Cover pages for the RACT analysis for Utility Trailer Manufacturing Company
were omitted. These pages should appear prior to page 1 of TSD Section 5.c.xxxv.
Top